Well I got the pump all hooked up and the everythign plumbed and leak test but I am running into issue with getting the siphon to start on the over flow. I kinda figured I would run into this with the 20 ft of horizontal ish pipe but there was also a good 13 ft vertical drop as well. So I was kind of hoping it would work but als I was not so lucky. I have noticed that the open channel move alot more water initally and is not hard to make siphon if I cover the air breather hole. I was thinking of basically making all three the open channel initially to get some water movement in the pipe work and then as the water rises a little more it will close off the air tube making it air tight and a full siphon.
And worst case scenario if the wate rget high enough I will have 3 siphon running until the water lower and then it will probably oscillate back and forth.
My main issue is that I cant get the siphons to start before I over flow the DT upstairs. At least it doesn;t look liek it, I have not overflowed the tank .. yet
And worst case scenario if the wate rget high enough I will have 3 siphon running until the water lower and then it will probably oscillate back and forth.
My main issue is that I cant get the siphons to start before I over flow the DT upstairs. At least it doesn;t look liek it, I have not overflowed the tank .. yet