Jewel
Guest
- Joined
- Oct 11, 2011
- Location
- Wingham Ontario
Can you guys tell me what size holes to drill? I was thinking 3 inch and a half holes for the external over flow and 4 one inch holes for the returns. The returns would be in the four corners on the back using a check valve so they don't drain back to the sump. The 3 holes in the over flow would consist of 2 to the sump and one to the fuge.
Is there a formula to use for the return pump so as to not over flow the tank?
Is there a formula to use for the return pump so as to not over flow the tank?